Certified that a Grid Connected SPV Power Plant of KWp capacity has been installed at the site District of MAHARASHTRA which has been installed by M/S on . The system is as per BIS/MNRE specifications. The system has been checked for its performance and found in order for further commissioning.
The above RTS installation has been inspected by me for Pre-Commissioning Testing of Roof Top Solar Connection on dt. as per guidelines issued by the office of The Chief Engineer vide letter no 21653 on dt. 18.08.2022 and found in order for commissioning.